| Price | Per tonne | Change |
| This year | €1,500 | – |
| Cost-based benchmark (assumed) | €1,380 | −8% |
| Agreed price | €1,425 | −5% |
Against last year, that’s €150,000 of hard savings: (€1,500 − €1,425) × 2,000 t. Against the assumed benchmark, you paid €45 a tonne more, or €90,000 over the year. The saving is real in the budget, but it falls short of the decline the cost drivers supported. Splitting a price change into a market part and a negotiated part is the core of our guide to purchase price variance, and it applies to savings as much as to increases.
Hard savings vs soft savings
In many organisations, hard savings means cost savings: a lower price or lower spend you can trace to invoices. Soft savings then covers cost avoidance and other benefits that don’t reduce spend, such as less time spent on supplier issues. Definitions vary, so agree them with finance. “Soft” describes how it’s measured. It says nothing about how much it’s worth. A well-evidenced avoidance figure on a rising market can be worth more than a hard saving that the market handed you.
Cost avoidance vs cost reduction
Cost reduction usually means lowering what something costs you by changing what or how much you buy, for example switching to a cheaper grade that does the same job or cutting scrap so you need less material. Cost avoidance is about future costs you’d otherwise have paid, such as an increase you keep from landing in full. Definitions vary here too, so agree them with finance.
How to report cost avoidance so finance accepts it
Test the ask against cost drivers, agree the baseline and method with finance before the quarter, report avoidance on its own line, and reconcile it with actual volumes.
Avoidance doesn’t necessarily show as lower spend than last year, so finance has to accept your baseline on the evidence. These six steps make that easier:
- Keep the increase in writing. The supplier’s letter or quote, dated before the negotiation started.
- Test the ask against cost drivers. Record which indices you used, their weights and the dates.
- State volume and period. The tonnes the price applies to and how long the price holds.
- Agree the baseline and method with finance first. Do it before the quarter starts.
- Report it on its own line. Separate from hard savings, so neither number is diluted.
- Reconcile it afterwards. Replace forecast volume with actual volume, and update index values only as the agreed method says.
Locking a price: avoidance you only know later
Avoidance from locking a price builds up delivery by delivery, so agree in advance how you’ll measure it, and report it whichever way it goes.
Some avoidance comes from timing rather than negotiation. If you lock a price for six months, the result is what the same deliveries would have cost at market minus what you actually paid at the locked price, which already includes any premium. If market prices end up below the locked price, the lock cost you money. Track the result as deliveries come in, and finalise it at the end of the period. Our piece on whether a fixed-price offer is worth the premium covers how to weigh that decision before you make it.
This matters into 2027. PricePedia’s November 2026 outlook forecasts its European plastics and elastomers index up about 10.6% for 2026 and a further 3.7% in 2027 (annual changes, in euros), even as it expects energy prices to fall in 2027. Rising prices make avoidance more important to measure well, and setting the baseline before the negotiation, instead of reconstructing it at quarter end, makes it easier to defend.
From the last increase to the next one
The examples above look at negotiations already done. The harder part is having the baseline ready when the next increase letter arrives, for every material you buy, with the indices already weighted and current.
For the materials Sybilion covers, it tells you whether to accept, counter, lock or wait, based on what the price should be given its cost drivers and where it’s heading, with the range stated. The benchmark exists before the negotiation, so the avoidance figure you report afterwards rests on evidence rather than on the supplier’s opening number.
Want a baseline to take to finance?
We’ll show you what the cost drivers support for your most exposed materials.
Frequently asked questions
Is cost avoidance a real saving?
Yes, but not necessarily a saving in spend. Cost avoidance means you paid less than you otherwise would have, not less than before. It’s a real result if the baseline is tested and agreed with finance in advance, and it’s measured on actual volume.
Is cost avoidance hard or soft savings?
Often soft savings, depending on how your organisation defines them. It doesn’t necessarily reduce spend, so it can’t be traced to invoices the way hard savings can. That’s why the baseline and the method need to be agreed with finance before the result is reported.
How do you calculate cost avoidance in procurement?
Multiply the difference between the baseline price and the agreed price by the volume you buy at that price during the period. For raw materials, test the supplier’s ask against the cost drivers, agree the baseline with finance, and reconcile with actual volume at the end.
What is the difference between cost avoidance and cost reduction?
Cost avoidance is about costs you’d otherwise have paid, such as an increase you keep from landing in full. Cost reduction usually means lowering what something costs you, for example by switching to a cheaper grade or using less material. Definitions vary, so agree them with finance.
Can one negotiation produce both savings and avoidance?
Yes. If the agreed baseline is above last year’s price and you agree a price below last year’s, the drop below last year is a saving and the gap between the baseline and last year’s price is avoidance. Count each part once.
Questions about a specific material or contract? Talk to us about your most exposed materials.